ZEN LUXURY COMPLEX

THE FUTURE OF PROFITABLE LUXURY REAL ESTATE

Just 300 meters from the ocean, this exclusive development features luxury smart apartments and villas designed for investors who expect real returns. Each unit combines modern design, smart home technology, and professional management to maximize returns with minimal effort.

Located in Cemagi, one of Bali’s most promising areas, the project offers high ROI potential, strong capital growth, and the comfort of true luxury living.

PROJECT LAND AREA
99
OF APARTMENTS
10 UNITS
L.A OF APARTMENTS
UP TO 1
AVERAGE INCOME
11 - 1 % ROI
OF VILLAS
1 UNITS
L.A OF VILLAS
UP TO 1

ACCESSIBILITY TO KEY LOCATIONS

K Club – 1 min

Riviera Coffee – 3 min

Cemagi Beach – 4 min

Island Sport Club – 4 min

Mengening Beach – 5 min

Flower Boy Coffee – 7 min

Pepito Supermarket – 8 min

Seseh Beach – 9 min

Munggu Beach – 10 min

Luna Beach – 15 min

Nuanu Creative Center – 15 min

Pererenan Beach – 19 min

La Brisa Beach Club – 20 min

Finns Beach Club – 20 min

Atlas Beach Club – 20 min

LOCATION

APARTMENTS

PREMIUM SUITES

OF 1 BEDROOM APARTMENTS

PREMIUM SUITES

OF 2 BEDROOM APARTMENTS

3 BR VILLA | 198 SQM

3 BR VILLA | 264.5 SQM

UNIT OF THE COMPLEX

CONSTRUCTION PROGRESS

CONSTRUCTION REPORT

DATE: 25 NOVEMBER 2025

• Corridor gypsum board frames installed.

• All unit drywall frames completed.

• Awaiting sound-insulation material to continue installation.

• Façade metal structures installed; additional façade metal works ongoing.

• Gypsum board installation in progress

• Units prepared for wall panel installation

• Corridor tiling completed

• Gypsum board works in corridors ongoing

• Balcony tiling completed

• Gas block installation fully completed

• Tiling works nearing completion

• Façade works commenced

• Gas block installation on the third floor ongoing

• Electrical works completed

• Engineering and MEP works in progress

• Gypsum board installation in progress

• Units prepared for wall panel installation

• Corridor tiling completed

• Gypsum board works in corridors ongoing

• Balcony tiling completed

• Gas block installation fully completed

• Tiling works nearing completion

• Façade works commenced

• Gypsum board installation in progress

• Units prepared for wall panel installation

• Corridor tiling completed

• Gypsum board works in corridors ongoing

• Balcony tiling completed

• Gas block installation fully completed

• Tiling works nearing completion

• Façade works commenced

• Foundation works completed

• Second-floor concrete slab casting scheduled

Overall construction is progressing steadily, with apartment blocks entering finishing stages and villa units advancing structurally.

CURRENT AVAILABILITY

UNIT OF THE COMPLEX

LEGAL DOCUMENTS

REMARC PROPERTY GROUP

“Real estate cannot be lost or stolen, nor can it be carried away. Purchased with common sense, paid for in full, and managed with reasonable care, it is about the safest investment in the world.”

– Franklin D. Roosevelt

click the image to zoom